ABSTRACT SYSTEM REVIEW OF THE MODIFIED LIGHT DUTY UTILITY ARM AFTER THE COMPLETION OF THE N.pdfVIP

ABSTRACT SYSTEM REVIEW OF THE MODIFIED LIGHT DUTY UTILITY ARM AFTER THE COMPLETION OF THE N.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ABSTRACT SYSTEM REVIEW OF THE MODIFIED LIGHT DUTY UTILITY ARM AFTER THE COMPLETION OF THE N

1SYSTEM REVIEW OF THE MODIFIED LIGHT DUTY UTILITY ARM AFTER THE COMPLETION OF THE NUCLEAR WASTE REMOVAL FROM SEVEN UNDERGROUND STORAGE TANKS AT OAK RIDGE NATIONAL LABORATORY R. L. Glassell, B. L. Burks, W. H. Glover (The Providence Group) PO Box 23408, Knoxville, Tennessee 37831-6426/USA Email: rlglassell@ Tel: 1-865-671-1434 ABSTRACT The Modified Light Duty Utility Arm (MLDUA) is a custom seven-degree-of-freedom long-reach manipulator system developed, designed, and built by SPAR Aerospace, Ltd. The MLDUA was delivered to Oak Ridge National Laboratory (ORNL) in November 1996. After operational tests and training cold tests, the MLDUA was moved to the first underground tank (W-3) in May 1997. After the completion of tank W-3, the MLDUA was used in cleanup operations of six other underground tanks, in this order, tanks W-4, W-6, W-7, W-10, W-8, and finally on tank W-9. Tank W-9 was completed in September 2000. Tanks W-3 and W-4 are 25-foot diameter tanks and the other five tanks are 50-foot diameter tanks. The MLDUA was deployed only in one tank riser for the 25-foot tanks. For the 50-foot tanks, the MLDUA was deployed in either two or four tank risers. The MLDUA performed the following types of operations in support of the underground tank waste cleanup operations: grasping the sluicer to allow deployment of the Hose Management Arm (HMA) into the tanks, holding and maneuvering the sluicer to remove tank water and waste material, tank wall radiation surveys, tank wall material sample collection, tank wall cleaning operations with high-pressure water jets, vertical pipe cutting operations, pipe plugging operations and support for tank wall coring operations. The MLDUA performed exceptionally well considering it is a one-of-a- kind long-reach manipulator prototype design. The MLDUA operations included over 7400 hours of in-tank exposure to radiation fields with an estimated total dose of 77,000 rads. Total working time within the tanks was over 2250 hours. W

文档评论(0)

l215322 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档