- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Factory Layout e Assembly Lines
Factory Layout Assembly Lines
Process Model
Routing
Header
Activity
Group
Operation
Operation (optional)
Grouping Node (optional)
Header Node
Activities
Mode (duration)
Activity
The header node represents the highest level of the process model. Header data and the activity sequence are stored at this level. Required
The grouping node is used to group several activities and operations together. The grouping node can be used to build up multi level process hierarchies (ie, lower level grouping nodes). Grouping nodes can be used in multiple process structures. Optional
Operations group activities for joint execution. It is similar to the grouping node, but there are differences in how operations respond to configurable component selection. Operations can not be used to create multi level hierarchies. Optional
Activities are the basic elements of the process model. Activities discribe how a process step is executed. The mode discribes how and where activities are executed
Process structure
Cabin
Assembly
SafetyBeltback
Cabin
SafetyBeltfront
Sunroof
assembly
Rear-view
mirror
assembly
safety belt
front
assembly
safety belt
back
assembly
buckle front
assembly
buckle back
Assembly
sunroof
Adjust sunroof
Header Node
Grouping Node
Operation
Activity
part of - relation
sequence - relation
…
Process Structure: Component assignment and activity selection
B
4
5
Components
Activities
7
Act-
Plan
Input relation makes activity optional (it is either on or off).
If no input relationspoint to an activity, the activity is always active.
If input relations point to an activity, the activity is active only when the component is selected.
Input relations (components) may only be assigned to activities.
2
6
A
X
Required Selection
Multiple Selection
1
2
Factory Layout: object overview and relationship
Line 1
Level 1
Line net
Line Resource
Factory Layout Objects
All Objects Plant Specific (because of supply area, for example)
Relations between iPPE application objects
Prod
您可能关注的文档
- Dickkopf 1与骨破坏性疾病的关系.pdf
- Dialysis process for the removal of surfactants to form colloidal mesoporous silica nanopartices-S.pdf
- Differential sorption behaviour of aromatic hydrocarbons on.pdf
- Diffractive charm photoproduction at HERA ep-collider.pdf
- Differential Calculus and Discrete Structures.pdf
- Differential Evolution Markov Chain makes Bayesian computing easy..pdf
- DIG Northern Starter Kit.pdf
- Diffuse Esophageal Spasm.pdf
- Digital Chest Radiography with a Selenium-Based Flat-Panel.pdf
- Digital Booklet - Last Train To Paris.pdf
文档评论(0)