- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Makeblock Ultimate Robot Kits - Ball Launcher
Introduction
The Ball launcher is one of the Ultimate robot. You can control your robot with your smart device through a Bluetooth connection. And by adjusting the rotation of the motor launch a ball.
For the installation steps, please do as follows. If you have any question about it, please post your trouble on the forum, I would give a replay.
Now, let’s start
Step 1
Materials list
4*Threaded Shaft 4*39
3*D Shaft 4*50
2* Shaft Collar 4mm
4*Shaft clamping hub 4mm
2*Beam 0808-88
2*Beam 0824-128
2*Timing pulley Slice 90T-New
1*Motor Bracket 25V2
1*Motor Bracket 37V2
2*Plate D
1*Bracket P3
1*Timing pulley 18T
1*Gear m1*16
30*Screw M4*8
27*Screw M4*14
2*Screw M4*16
4*Screw M4*22
1*Screw M4*35
3*Beam 0808-184
2*Beam 0824-144
2*Beam 0824-96
1*Beam 0824-80
2*Beam 0824-64
2*Base board plate V1.1
19*Hex nuts M4-N
6*Screw M3*8
12*Hex Socket screw
4*Plastic ring 4*7*2
5*Nylon M4
1*Gear m1*80
1*Timing pulley 90T
1*Timing belt 123T 98mxl
1*DC Motor 25mm V2.0
1*DC Motor 37mm V2.0
3*Bracket 3*31
1*Bracket 3*6
1*Rubber band
1*Plate 7*9
Electronic materials
1*Makeblock Orion
1*6P6C RJ11 cable 20cm
1*Me Bluetooth Module V2.0
1*Battery Bracket
6*AA Battery 1.5V
Step 2
Tools
1.5mm Hexagonal Screwdriver
3mm Screwdriver
Spanner
Step 3
Building the base:
Materials:
2*Beam 0824-144
2*Beam 0824-128
2*Beam 0824-96
1*Beam 0808-88
10*Screw M4*14
4*Screw M4*22
4*Hex nuts M4-N
Procedure:
Install the Beam 0808-88 on Beam 0824-128.
Assemble a rectangle by 2*Beam 0824-128, 2*Beam 0824-144 and 8*Screw M4*14
The Beam 0824-96 vertically mounted on the Beam 0824-144 with 4*Screw M4*22 and 4*Hex nuts M4-N
Step 4
Assembling transmission of DC motor 37mm
Materials:
6*Screw M4*14
4*Screw M3*8
5*Hex Socket screw
4*Hex nuts
1*Beam 0808-88
1*Beam 0824-80
1*D Shaft 4*50
2*Shaft clamping hub 4mm
2*Threaded Shaft 4*39
1*Timing pulley 90T
2*Timing pulley Slice 90T-New
1*DC Motor 37mm V2.0
1*Motor Bracket 37V2
1*Timing belt 123
您可能关注的文档
- 315住宅底板砼施工摘要.doc
- CN201310225785-二氧化钛纳米管阵列光电极的制备方法讲义.pdf
- CNAS-EL-032012检测和校准实验室认可能力范围表述说明讲义.pdf
- CRC学习笔记讲义.pdf
- DB34T1612-2012无公害食品园黄梨生产规程讲义.pdf
- DB372376-2013山东省区域性大气污染物综合排放标准(意见稿)讲义.pdf
- DH-ITC302-GVRB3A高清相机卡口系统施工(视频、线圈和视频线圈切换型)V1.0讲义.docx
- DSP钢琴音准仪讲义.docx
- EDAchap1讲义.pdf
- ExchangeServer2010SP2--高可用性(八)_配置内外网邮件收发讲义.docx
文档评论(0)