- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Typicalgeneratorsetsinstallationguidelines
Typical generator sets installation guidelines
AA)Generator sets room layout1.if there is enough space at site,it is preferable to mount the genset in row than in column.2.the output terminals should be closely with distribution room when genset and control room are adjoin.3.put the batteries near to start motor side.4.the air inlet opening should be set aside the generator end,sufficient space must be left for it.exhaust gasshould be ventilated outside the room,and its opening should near the radiator.5.genset noise silencing materials and acoustic enclosure around the room should work together for reducingnoiseIllustration A-1BB)Installation1.on reinforced concrete foundationgenset should be mounted on a reinforced concrete which past one month of 173kPa pressure test.thefoundation should be at least 150mm above ground level and have a minimum 150mm extention on each sides,there should be J or L type anchor bolts pre-mounted.2.on base oil tankthe engine and generator should be mounted on a common base fuel tank through vibration dampers,the base tankcan withstand both static load and dynamic load of genset,leave a necessary clearance for future service.3.on vibration isoulation foundationsimilar performance with item1Illustration B-1 CC)Intake and exhaust system1.use support bracket for exhaust pipe and turbocharger2.a bellow is prohibited for compensating installation error or used as an elbow 3.choose 610mm or above bellows for 200kW or above gensets4.horizontal exhaust pipe should be slightly sloped downward 0.3-0.5% grade towards outside,arrangea drain valve at the lowest point5.arrange a drain plug at the lowest point if the exhaust pipe must be sloped upward.6.never use exhaust pipes with dimension less than the exhaust manifold7.special attention should be taken for shared exhaust pipeIllustration C-1DD)Cooling system1.ventilation inlet opening should be arranged at the end of or near the alternator,area should be
您可能关注的文档
- SelectionofPSCHSequences.doc
- self-assessmentofalignmentwiththeGEintendedlearning.doc
- Self-portraitureAcquaintancewiththeelements.doc
- SemanticConceptionsofInformation.doc
- securityofdistributedsystem.doc
- sendemailtramail.doc
- sentancesandvocabulary.doc
- sentencecompletion.doc
- sendemailtramail3.doc
- Securityrequirementsengineeringframeworkforsoftwareproductlines.doc
- 湖北省2021-2022学年度八年级上学期数学期中试卷(I)卷(考试) .pdf
- 浅析大数据分析技术在油田生产中的应用 .pdf
- 湖北省鄂州市鄂城区2023年化学九年级第一学期期中经典试题含解析.pdf
- 海南废旧轮胎资源化综合利用项目可行性研究报告 .pdf
- 济南的冬天 教学设计(赛课用)人教部编版七年级语文上册 .pdf
- 润滑油系统提高产品质量技术改造设立安全评价报告 .pdf
- 液压换向阀项目可行性研究报告 .pdf
- 湖北省武汉市青山区任家路中学2023-2024学年九年级上学期9月月考物理试 .pdf
- 沪粤版八年级物理下册九章学情评估附答案 .pdf
- 湖北省黄石市四区联考2022-2023学年七年级上学期期中数学试卷.pdf
文档评论(0)