Typicalgeneratorsetsinstallationguidelines.docVIP

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Typicalgeneratorsetsinstallationguidelines

Typical generator sets installation guidelines AA)Generator sets room layout 1.if there is enough space at site,it is preferable to mount the genset in row than in column. 2.the output terminals should be closely with distribution room when genset and control room are adjoin. 3.put the batteries near to start motor side. 4.the air inlet opening should be set aside the generator end,sufficient space must be left for it.exhaust gas should be ventilated outside the room,and its opening should near the radiator. 5.genset noise silencing materials and acoustic enclosure around the room should work together for reducing noise Illustration A-1 BB)Installation 1.on reinforced concrete foundation genset should be mounted on a reinforced concrete which past one month of 173kPa pressure test.the foundation should be at least 150mm above ground level and have a minimum 150mm extention on each sides, there should be J or L type anchor bolts pre-mounted. 2.on base oil tank the engine and generator should be mounted on a common base fuel tank through vibration dampers,the base tank can withstand both static load and dynamic load of genset,leave a necessary clearance for future service. 3.on vibration isoulation foundation similar performance with item1 Illustration B-1 CC)Intake and exhaust system 1.use support bracket for exhaust pipe and turbocharger 2.a bellow is prohibited for compensating installation error or used as an elbow 3.choose 610mm or above bellows for 200kW or above gensets 4.horizontal exhaust pipe should be slightly sloped downward 0.3-0.5% grade towards outside,arrange a drain valve at the lowest point 5.arrange a drain plug at the lowest point if the exhaust pipe must be sloped upward. 6.never use exhaust pipes with dimension less than the exhaust manifold 7.special attention should be taken for shared exhaust pipe Illustration C-1 DD)Cooling system 1.ventilation inlet opening should be arranged at the end of or near the alternator,area should be

文档评论(0)

panguoxiang + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档