Lessons Learned from Design and Test of Latticed Steel Transmission Towers.pdfVIP

Lessons Learned from Design and Test of Latticed Steel Transmission Towers.pdf

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Lessons Learned from Design and Test of Latticed Steel Transmission Towers

1 Lessons Learned from Design and Test of Latticed Steel Transmission Towers Quan He Fan, P.E., M. ASCE1 ABSTRACT Design of latticed steel transmission towers is a challenging task which involves lengthy modeling and detailing of significant amount of steel members and connections. Testing of the towers designed validates consistency between modeling and detailing and ensures the towers are designed to withstand design loads without premature failures. This paper presents lessons learned from design and testing of latticed steel towers in a recent project of developing a family of nine (9) 500kV transmission towers. The paper provides a discussion about the process of selecting bidders for design, detailing and fabrication of latticed steel towers, and a brief discussion of determining materials used in the towers. The paper also discusses comparisons of different tower weights for various tower base widths and foundation reactions to achieve a cost effective design combining both the tower and its foundations. Examples of modeling tower members using beam elements in PLS-TOWER are presented to illustrate the importance of fully understanding the main purpose of using beam elements in TOWER. Variations between tower modeling and detailing are presented with specific attention to member and connection eccentricities. Finally, lessons learned from six (6) tower tests are discussed. INTRODUCTION The majority of 500kV transmission lines in Georgia were constructed in 1970s. All latticed steel towers used in the 500kV transmission lines in Georgia were originally developed by Georgia Power Company (GPC) in the late 1960s and early 1970s. The towers were not designed with working clearances for hot line nor helicopter maintenance. During the 1980s and 1990s, there was not much demand for building new 500kV transmission lines in Georgia. However, in early 2000s, construction of several hundred miles of new 500kV transmission line

文档评论(0)

l215322 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档