- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
(变压器作业指导书英文版)Method statement of electric test for transformer
Contents
1. General
2. Reference document
3. Commissioning preparation and work condition
4. Commissioning method and requirements
5. HSE measures and requirements
1. General
1.1 This work instruction is designed for oil-immersed transformer test of INDONESIA TANJUNG AWAR AWAR2*350MW power plant project.
1.2 150kV distribution device adopts 3/2 breaker connecting method, 2 sets of generator units are connected to 150kV bus bar via the main transformer. And 1 start/standby transformer is designed as the start and standby power all over the plant, and connected by 150kV distribution bur bar. 1 set of 150/20kV TFT is connected to 150KV bus bar according to the contract requirement. The 150KV system is made of 4 sets of complete parts. The inlet and outlet loop of transformer are all installed 3-phase voltage transformer, single phase voltage transformer is installed on the 150KV bus bar.
2. Reference document
2.1 《Electric power industry technology management regulations》
2.2 《Manufacturer specification and technical document》
2.3 《Design institute drawing and technical requirements》
2.4 《Electrical equipments installation project electrical equipment handover test standard》
3. Commissioning preparation and work condition
3.1 Keep the accessories and manufacturer technical documents are complete after positioning the transformer, and the products inspection shall comply with the technical agreement requirements.
3.2 Test shall be proceeded in the sunny day, and avoid the rainy or snowy day.
3.3 Notice the representative of manufacturer , construction unit, and supervisory company to supervise on the site before positioning the transformer.
4. Commissioning method and requirements
4.1 Transformer test procedure
4.2 Measuring insulation resistance of current transformer secondary winding :
Measure the insulation resistance between secondary windings and the one
您可能关注的文档
- 2017年四级高频词汇汇总.doc
- 期末复习单词.pptx
- 必修二Unit3学案.doc
- 2017年最新大学英语四级高频核心词汇.doc
- 小学英语课本词汇.doc
- Libraries in the World.ppt
- 大学英语四级:核心词汇(一).docx
- unit 8 environmental engineering.ppt
- 3500单词听写1A.ppt
- 大学英语四级最新必背核心单词.doc
- 新解读《GB_T 37279-2018进出境瓜类种子检疫规程 细菌》.docx
- 新解读《GB_T 36343-2018信息技术 数据交易服务平台 交易数据描述》.docx
- 新解读《GB_T 36462-2018面向组件的虚拟样机软件开发通用要求》.docx
- 新解读《GB_T 36249-2018基于模型的航空装备研制 技术数据包》.docx
- 新解读《GB_T 36267-2018钢化玻璃单位产品能耗测试方法》.docx
- 新解读《GB_T 36472-2018信息处理用藏语短语分类与标记规范》.docx
- 新解读《GB_T 36769-2018阳离子交换树脂再生转型率测定方法》.docx
- 新解读《GB_T 5195.18-2018萤石 硫酸钡含量的测定 重量法》.docx
- 新解读《GB_T 25975-2018建筑外墙外保温用岩棉制品》.docx
- 新解读《GB_T 36716-2018节能评估技术导则 燃煤发电项目》.docx
文档评论(0)