The type of onstruction organization designThe type of construction organization design.doc
- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
The type of onstruction organization designThe type of construction organization design
The type of construction organization design
Construction organization design can be divided into three categories: construction organization design outline and construction organization design and special construction organization design.
1. An outline according to the preliminary design and construction organization design tender documentation is used for construction layout to make overall arrangement, meet the needs of the bid, is the design of the principle, special is the preparation of construction organization design and construction organization design basis, belongs to the construction organization design before bidding.
2. The total construction organization design is based on a number of unit engineering group as the main object, according to the initial design or enlarge the preliminary design drawings, construction contract, construction organization and design outline as well as other relevant data and establishment of site construction conditions, its content and scope is summed up, is the preparation of special construction organization design basis, belong to the bid after the construction organization design.
3. Special construction organization design is a complex and special operation project as the main object of establishment, the construction process of special engineering plays a role of guidance and restriction, belongs to the bid after the construction organization design.
Second, the construction organization and design of the principle and basis
(a) the construction organization and design principles
1. Abide by the national project of the construction of the laws, regulations, guidelines and policies, technical standards and specifications.
2. In line with the construction of the contract or the technical and economic indexes of the tender documents (schedule, quality, safety, cost, etc.).
3. Observe the basic construction project procedures, the use of reasonable construction sequence and construction technique.
4. The use of
您可能关注的文档
- 5S法在手术室专科手术间理中的应用5S法在手术室专科手术间管理中的应用.doc
- 5W1H分析法详情5W1分析法详情.doc
- 5W2H分析法又叫七何分法5W2H分析法又叫七何分析法.doc
- 新教材八(下)期末复习卷(六)2014.5--八社政新教材八(下)期末复习试卷(六)2014.5--八社政.doc
- 新月派是现代新诗史上一重要的诗歌流派新月派是现代新诗史上一个重要的诗歌流派.doc
- 5压浆封锚作业指导书5压封锚作业指导书.doc
- 新概念 Lesson 1新概念 Lesson 41.doc
- 5标盾构端头井加固施工方5标盾构端头井加固施工方案.doc
- 新标准外研版三年级英语册复习模块教案共计6课时新标准外研版三年级英语上册复习模块教案共计6课时.doc
- 5定稿修改 感情确已破5定稿修改 感情确已破裂.doc
- 2024年医院营销推广方案.pdf
- 2024年幼儿安全教案.pdf
- 江苏省镇江市三校、泰州市部分学校2024-2025学年高二上学期11月期中考试 物理含答案.pdf
- 2024年春季传染病预防知识普及教程.pptx
- 造纸机械项目风险识别与评估综合报告.docx
- 2024-2025学年统编版二年级语文上册第一单元知识考点通关综合训练(附答案).pdf
- 辽宁省朝阳市重点中学2024-2025学年高一上学期11月期中联考试题 物理含答案.pdf
- 2024年高层建筑施工材料研究与选择.pptx
- 【高二下期末】陕西省渭南市临渭区2021-2022学年高二下学期期末教学质量检测英语试题(解析版).docx
- 烟气脱硫设备项目风险识别与评估综合报告.docx
文档评论(0)