carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs
您可能关注的文档
- 10最有投资价值新蓝筹点评.doc
- 10工专业《化工设备设计基础》教学大纲.doc
- 10管毕业论文教学工作计划.doc
- 10管理学基础网上形考任务及答案.doc
- 10本科噪声控制工程教案.doc
- 10质量考核管理办法(升产许可认证修订版).doc
- 10设1班《广告市场营销》教案.doc
- 10长沙县水利工程质量监督管理实施细则.doc
- 10术 材料工艺.doc
- 10项集团公司企业标准编号和名称.doc
- access课题报告以首钢为例解读.docx
- access实验报告格式st.docx
- 宣贯培训(2026年)《GBT 20972.2-2025石油天然气工业 油气开采中用于含硫化氢环境的材料 第2部分:抗开裂碳钢、低合金钢和铸铁》.pptx
- access实验报告推荐.docx
- 宣贯培训(2026年)《GBT 20972.3-2025石油天然气工业 油气开采中用于含硫化氢环境的材料 第3部分:抗开裂耐蚀合金和其他合金》.pptx
- access实验报告样板.docx
- 职场心理危机干预策略培训PPT.pptx
- access数据库图书销售系统实验报告.docx
- abaqus中的动态分析方法.docx
- abbrobotstudio码垛搬运报告.docx
原创力文档

文档评论(0)