carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 中国际经济交流中心案例.doc
- 中国量学院机电工程学院机械专业现代设计方法文献综述十篇期刊+一片上交综述完整版.doc
- 中国金市场发展趋势.doc
- 中国院类上市公司细分行业龙头.doc
- 中国际经济法学会会暨学术研讨会.doc
- 中国险市场现状及存在的主要问题.doc
- 中国通网格经理营销与管理能力提升特训营四天.doc
- 中国餐市场调查与预测麻旭.doc
- 中外作公司章程范本设董事会,监事.doc
- 中外小企业融资问题比较研究.doc
- 中国预制菜产业2025年行业标准制定与实施路径.docx
- 2025年智慧社区建设需求增长趋势与政策分析报告.docx
- 海洋科技创新趋势分析:2025年技术突破与未来十年市场预测报告.docx
- 增材制造(3D打印)在汽车行业轻量化设计中的应用分析及未来五年趋势.docx
- SpaceX商业航天发射服务市场技术创新与产业链发展分析报告.docx
- 电商直播行业合规性评估与监管流程优化建议报告.docx
- 生物医药冷链物流行业标准制定与行业未来五到十年发展路径研究报告.docx
- 无人机监管体系优化路径分析:2025年现状与未来十年发展蓝图报告.docx
- 2025年水泥行业绿色环保法规实施效果分析报告.docx
- 新能源汽车充电网络与电网互动技术研究报告.docx
文档评论(0)