- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HIGS
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installati
您可能关注的文档
- 互联上网服务营业场所安全生产制度.doc
- 云南烟叶生产基础设施建设管理规程修订版.doc
- 云阳村经济的现状及发展前景.doc
- 互联企业融资商业计划书模板.doc
- 云南电子商务税收现状及改革建议.doc
- 互联企业研发管理问题分析与对策.doc
- 互联保险业务管理暂行办法解读.doc
- 互联思维下的传统企业转型与落地实施策略森涛培训.doc
- 云南省第三届中小学生安全知识网络竞赛1.doc
- 互联+红利时代房地产企业转型与升级路径:刘炜老师.docx
- DB51_T 3137-2023 柑橘园间作豆类栽培技术规程.docx
- Q_HY 07-2023 低温阀门技术条件.docx
- DB52∕T 1454-2019 精神病专科护理服务基本规范.docx
- T_XJZJXH GY10002.2-2024 “新疆品质” 特色产品技术规范 薰衣草精油.docx
- DB21_T 3981-2024 滑菇采收贮运技术规程.docx
- DB1308_T 368-2025 北柴胡生产技术规程.docx
- DB1307_T 454-2024 谷子品种 张杂谷6号.docx
- DB36T 1574-2022 食品快速检测结果验证通用技术规范.docx
- DB13(J)∕T 202-2016 公共建筑能耗远程监测系统技术标准.docx
- DB21_T 1564.9-2007 岩土工程勘察技术规程 抽水试验规程.docx
文档评论(0)