- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
天津考研网()- 天津地区考研门户网站!
? 公司总机:022? 7×24全天候客服热线:02258054799
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by
您可能关注的文档
最近下载
- 2024年初级会计师《经济法基础》三色速记手册.pdf VIP
- 2024年贵州省黔东南苗族侗族自治州凯里市鸭塘镇招聘社区工作者真题及参考答案详解.docx VIP
- 《小学语文课程与教学》第2章小学语文课程资源.ppt VIP
- 公众聚集场所防火措施之加强消防安全管理模板范本.docx VIP
- SPC控制图的系数和公式表.xls VIP
- 安徽省舒城中学2024-2025学年高一上学期入学检测英语试题(无答案).docx VIP
- 关于冯唐的经典语录冯唐经典语录100句.pdf VIP
- 学校、幼儿园校舍能力提升改造建设项目监理服务方案投标文件(技术方案).doc
- 三维柔性焊接工作台系统焊接变位机焊接自动化.PDF VIP
- 国际法院罗马规约.doc VIP
文档评论(0)