- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全国级妇幼卫生工作绩效考核标准
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 党员常性学习制度六项制度.doc
- 党委传部工作总结.doc
- 党委工作总结工作安排.doc
- 党委记在创建“四好”领导班子工作专题研讨会上的讲话.doc
- 党工作制度.doc
- 倒班、餐厅及污水处理站工程月报NO..doc
- 党建作责任状.doc
- 党建作项目化立项申.doc
- 党总工作制度和职责.doc
- 党支标准化建设工作手册.doc
- DB37_T 5106-2018 装配式混凝土结构现场检测技术标准(OCR).pdf
- DB37_T 5172-2020 钢筋混凝土综合管廊工程施工质量验收标准(OCR).pdf
- 高考总复习优化设计二轮用书数学 专题突破练8 三角函数的图象与性质.pptx
- DB37_T 4384-2021 混凝土桥梁有效预应力无损检测技术规程(OCR).pdf
- DB35_T 1433-2019 石油化工装置防雷检测技术规范(OCR).pdf
- DB13(J)63-2011 河北省居住建筑节能设计标准(OCR).pdf
- 高考总复习优化设计二轮用书数学 专题突破练22 直线与圆锥曲线的位置关系.pptx
- DB37_T 2366-2022 《回弹法检测混凝土抗压强度技术规程》(OCR).pdf
- 高考总复习优化设计二轮用书数学 第1讲 计数原理.pptx
- DB37_T 2367-2022 《回弹法检测砌筑砂浆抗压强度技术规程》(OCR).pdf
文档评论(0)