- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 助理流师职业资格认证考试理论卷.doc
- 助理流师职业守则.doc
- 助理流师考试真题仓储管理答案.doc
- 助理力资源管理师三级真题及答案最全最新.doc
- 助理力资源教程第三章培训.doc
- 劳务包部工作流程及管理方案.doc
- 劳动同制度的政策基础与功能冲突.doc
- 劳动全知识培训资料.doc
- 劳动同制度的政策基础与功能冲突.doc
- 劳动全教育讲稿.doc
- 2025年线上职业技能竞赛云平台赛事可持续发展与品牌影响力提升策略.docx
- 2.6MW分布式光伏项目环境影响报告书.docx
- 2025年餐饮品牌供应链供应链金融产品创新报告.docx
- 【2025秋】人教版九年级化学上册教学计划(及进度表).docx
- 社区养老服务设施适老化改造区域规划与布局研究报告.docx
- 合成氨装置操作工《合成氨装置操作中级工测试题》考试题_2.doc
- 2025年跨境电商办公用品电商供应链绿色物流与可持续发展报告.docx
- 社区养老服务设施适老化改造关键技术及应用报告.docx
- 社区养老服务设施改造标准与适老化设计理念研究.docx
- 2025年社区便民服务综合体社区养老服务创新研究报告.docx
文档评论(0)