- 1、本文档共39页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 劳动护和安全法.doc
- 包宗:城乡一体化背景下的苏南农业适度规模经营.doc
- 包头久钢构有限公司.doc
- 劳务标管理办法试行定稿.docx
- 劳动护和安全法.doc
- 化妆夏季市场推广企划案卓越广告.doc
- 化妆店长培训.doc
- 化妆专卖店人员皮肤知识、陈列、销售.doc
- 化妆销售培训师.doc
- 化妆店长培训.doc
- 1.2.1 物质的量 课后练(含答案)高中化学 必修1(苏教版2019).doc
- 2.2.2 化学反应的计算 课后练(含答案)高中化学 必修1(苏教版2019).doc
- 【暑期衔接】专题07 补全对话与短文--2025年 译林版(三起)新四年级小学英语专项自学(含答解析).docx
- 【暑期衔接】专题06 补全对话与短文--2025年 人教精通版 新四年级(三升四) 小学英语专项自学(含解析).docx
- 2.3.2 原子核外电子排布 课后练(含答案)高中化学 必修1(苏教版2019).doc
- 【暑期衔接】专题06 任务型阅读--2025年 译林版(三起)新六年级(五升六)小学英语专项自学(含解析).docx
- 【暑期衔接】专题04 阅读理解--2025年 人教精通版 新四年级(三升四) 小学英语专项自学(含解析).docx
- 人工智能2.0时代的人才培养和通识教育课程建设202505711A.pptx
- 河北省定州中学2017-2018学年高二下学期第二次月考数学试题.doc
- 21.2.2公式法(课件)人教版九年级数学上册(1).pptx
文档评论(0)