- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 8
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 化妆店长培训.doc
- 化妆专卖店人员皮肤知识、陈列、销售.doc
- 化妆销售培训师.doc
- 化妆店长培训.doc
- 化学修四第二章知识点汇集.doc
- 勘测计企业税费实务核算的探讨西部财会版.doc
- 化妆行业经验及销售技巧培训资料.doc
- 化学剂滴定分析容量分析用标准溶液的制备.doc
- 化学危害预防与控制的基本原则.doc
- 化学成药仿制产品开发选题参考.docx
- springbooot+vue基于java的房屋维修系统毕业论文.doc
- 中国消防救援学院《单片机系统实验》2023-2024学年第一学期期末试卷.doc
- 2025年溧阳纺织化学品项目申请.pptx
- 景区门票包销合同模板(3篇).docx
- 【股票技术指标学习指南】第七章第三节货币需要量的测算.doc
- 2025春 _ 人教版七年级英语下册【unit4】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit5】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit6】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit7】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit8】看音标写单词.doc
文档评论(0)