- 1、本文档共49页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
·江苏洋河酒厂股份有限公司来安基地2#收酒站收酒槽、储酒罐及工艺管道制作安装
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 42
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled.
您可能关注的文档
- 卫生业管理中级资格考试真题专业知识三.doc
- 卫生业管理资料.doc
- 卫生业管理试题整理.doc
- 卫生业管理题库答案.doc
- 卫生业管理资料.doc
- 博克件公司信息和实习生介绍.doc
- 卫生中级职称小儿外科学人机对话考试大纲相关专业知识和专业知识.doc
- 卫生关于印三级专科医院评审标准.docx
- 南宁息价,最新最全南宁工程造价信息网期刊下载.doc
- 卫生业管理学》第次作业1.doc
- 上海海洋大学《海洋环境分析技术》课件-21化学发光分析法.pdf
- 上海海洋大学《海洋环境分析技术》课件-20分子荧光分析法.pdf
- 上海海洋大学《海洋环境分析技术》课件-22色谱分离过程.pdf
- 上海海洋大学《海洋环境分析技术》课件-25气相色谱仪与固定液.pdf
- 上海海洋大学《海洋环境分析技术》课件-24色谱定性定量方法.pdf
- 上海海洋大学《海洋环境分析技术》课件-26气相色谱检测器.pdf
- 上海海洋大学《海洋环境分析技术》课件-29液相色谱固定相与流动相.pdf
- 上海海洋大学《海洋环境分析技术》课件-27气相色谱分离条件的选择.pdf
- 上海海洋大学《海洋环境分析技术》课件-28液相色谱仪器与类型.pdf
- 上海海洋大学《海洋环境分析技术》课件-3 原子光谱和分析光谱.pdf
最近下载
- 制造企业数字化中台技术中台数据中台业务中台建设方案(20页PPT).pptx VIP
- 防跑道侵入考试卷附答案.doc
- 3-1牛顿第一定律(解析版)—2024高考物理一轮复习100考点100讲.docx VIP
- 社会治安管理处罚法全文.docx VIP
- SL252-2017 水利水电工程等级划分及洪水标准.pdf VIP
- 监理例会会议纪要范文.docx VIP
- 新时代下黄河文化融入高校校园文化建设的路径探索.docx VIP
- SL260-2014 堤防工程施工规范.docx VIP
- 公司治理与股权激励董.pptx VIP
- 新解读《GB_T 12604.3-2013无损检测 术语 渗透检测》最新解读.docx VIP
文档评论(0)