- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation loc
您可能关注的文档
- 压力道元件制造单位安全注册与管理办法.doc
- 压力道元件制造程序.docx
- 压力道元件制造许可规则第号修改单.doc
- 压力器制造工艺卡.doc
- 压力器设计常用标准规范目录.doc
- 压力道使用登记管理规则试行..doc
- 压力道元件制造质保手册.docx
- 压力器设计常用标准规范目录.doc
- 压力道安全技术监察内部培训.doc
- 压力道安全管理题库整合版.docx
- 实施指南《GB_T26055 - 2022 再生碳化钨粉》实施指南.docx
- 实施指南《GB_T26237.1-2022信息技术生物特征识别数据交换格式第1部分:框架》实施指南.docx
- 实施指南《GB_T20092.1-2022 新闻信息标准》实施指南.docx
- 实施指南《GB_T20564.4-2022 低合金高强度钢》实施指南.docx
- 实施指南《GB_T2099.3-2022家用和类似用途插头插座第2-5部分:转换器的特殊要求》实施指南.docx
- 实施指南《GB_T26719-2022 用水单位用水统计通则实施指南:推动用水单位迈向智慧节水新时代》.docx
- 实施指南《GB_T3883.215-2022手持式、可移式电动工具和园林工具的安全第215部分:手持式搅拌器的专用要求》实施指南.docx
- 实施指南《GB_T5169.47-2022电工电子产品着火危险试验第47部分:与低压电工产品起燃和着火概率相关的电功率和能量分级导则》实施指南.docx
- 实施指南《GB_T6091-2022 刀口形直尺》实施指南.docx
- 实施指南《GB_T6702-2022 萘酸洗比色试验》实施指南.docx
文档评论(0)