- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
咨询师决策评价冲刺课件 HYPERLINK / \t _self
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 44
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color all
您可能关注的文档
最近下载
- 2025江苏南京农业大学新校区建设指挥部、基本建设处人员招聘10人考试备考试题及答案解析.docx VIP
- 河阴死者墓志义例与北魏后期墓志制作.doc VIP
- 2025江苏南京农业大学新校区建设指挥部、基本建设处人员招聘10人考试模拟试题及答案解析.docx VIP
- 2025-2026学年西师大版小学数学四年级上册教学计划及进度表.docx
- 2025江苏南京农业大学新校区建设指挥部、基本建设处人员招聘10人笔试备考题库及答案解析.docx VIP
- 2025江苏南京农业大学新校区建设指挥部、基本建设处人员招聘10人考试备考题库及答案解析.docx VIP
- 中国低空经济应用场景研究报告(2025).pptx VIP
- 科技英语语法篇 .pptx VIP
- 石文操作手册.pdf VIP
- 二零二五年度军队后勤保障中心部队食堂食材供应合同.docx VIP
文档评论(0)