- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大学兼职的调查内容
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 外语院科研工作量.doc
- 外贸业出口退税政策概述.doc
- 外贸业出口相关知识及纳税申报纳税申报.doc
- 外省浙勘察设计企业项目备案软件操作说明.doc
- 外航介:阿联酋航空公司.doc
- 复星手美投资集团建首家养老社区昨于沪开业.docx
- 外贸务管理系统功能简介.doc
- 外资业人力资源员工手册.doc
- 外资业人力资源员工手册范本.doc
- 外研大学英语教学管理平台学生用户手册.doc
- DB15T+4175-2025奶山羊智慧牧场 第5部分:生乳收购.docx
- DB15T+4178.5-2025奶山羊智慧牧场 第5部分:生乳收购.docx
- DB52T+1893-2025日间手术麻醉管理规范.docx
- DB52T+1878-2025+酒用高粱生产基地建设规范.docx
- DB52T+1879-2025+酒用高粱优质栽培技术规程.docx
- DB15T+4178.1-2025奶山羊智慧牧场 第 1 部分:环境监测与控制.docx
- DB15T+4170.3-2025阴山沿麓主要作物节水减肥技术规程 第3部分:小麦.docx
- DB44_T+2692-2025电动自行车报废及回收拆解服务规范.docx
- DB52T+870-2025酱香型白酒酿酒用水.docx
- 城市道路平交路口交通安全风险防控设计技术导则.docx
文档评论(0)