- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大连界金融中心钢构方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 大型炼企业现代集成制造系统的开发与实施.doc
- 大型板冲压模具毛坯快速制造新技术研究.doc
- 大型业网络培训解决方案.doc
- 大型形钢结构井架安装工法高家权.doc
- 大型畜交易市场检验检测中心建设标准.doc
- 大型宅小区物业管理方案.doc
- 大姜产管理技术.doc
- 基础计实务处理.doc
- 大型物中心定位与运营案例分析.doc
- 大学业生求职简历模板.doc
- 浙江省平阳中学2025-2026学年高三上学期8月开学考地理试题 Word版无答案.docx
- 浙江省七彩阳光新高考研究联盟2025-2026学年高三上学期返校联考历史试题 Word版无答案.docx
- 浙江省Z20名校联盟(名校新高考研究联盟)2025-2026学年高三上学期第一次联考历史试卷 Word版无答案.docx
- 浙江省七彩阳光新高考研究联盟2025-2026学年高三上学期返校联考物理试题 Word版无答案.docx
- 单元总结提升.pptx
- 第22课 从局部抗战到全国抗战(练习,含解析).docx
- 浙江省强基联盟2025-2026学年高三8月联考语文试题 Word版无答案.docx
- 2024土工合成材料塑料土工格室.pdf
- 第23课 全民族浴血奋战与抗日战争的胜利.pptx
- 第23课 全民族浴血奋战与抗日战争的胜利.docx
文档评论(0)