- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大型形钢结构井架安装工法高家权
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 18
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
最近下载
- 金融科技行业系列报告之二:如何理解金融机构的数字营销?20210727-中信建投.docx VIP
- 中信建投-金融-中信建投政策研究-银发经济与养老金融系列-四-:保险资管行业赋能我国银发经济发展的机遇、挑战与路径.pdf VIP
- 工艺知识及关键控制点培训试卷及答案.docx
- 2025云南昆明供电局项目制用工招聘48人笔试参考题库附答案解析.docx VIP
- 中信建投-政策研究-五篇大文章-系列-五-数字金融.pdf VIP
- 中信建投政策研究“五篇大文章”系列(五):数字金融-240923-中信建投-22页.pdf VIP
- Taylor Swift中英歌词 对照.doc VIP
- 20180730-中信建投-中信建投“银行金融科技”系列深度之二:区块链,银行应用与前景.pdf VIP
- 正一天师手诀图谱秘录.pdf VIP
- 数字金融行业系列深度之一:deepseek如何加速金融业数字化转型?-中信建投-20250223.docx VIP
文档评论(0)