- 1、本文档共30页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程价基础知识
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 工业计史试题库.doc
- 工业程生活中的IE.doc
- 工业计论述题.doc
- 工业筑施工方案.doc
- 工业计独立操作会计分录清单指导.doc
- 工业造学院工作总结.doc
- 工业计英语专业词汇.doc
- 工业程与现场改善.doc
- 工业计工艺介绍.docx
- 工业造学院度科研工作总结.doc
- 专题18 完形填空 语境型基础篇 - 2023年中考英语语法题型总复习宝典(1).docx
- 专题14 一般现在时-备战2023年中考英语核心语法逐个突破(通用版)(原卷版).docx
- 专题7 主从复合句 2023年中考英语语法题型总复习宝典(1).docx
- 专题18 过去进行时-备战2023年中考英语核心语法逐个突破(通用版)(原卷版).docx
- 语法专题二 代词2【考点精讲精练】-2023年中考语法一点通(学生版)(1).docx
- 专题5 冠词-备战2023年中考英语核心语法逐个突破(通用版)(原卷版).docx
- 专题02 代词(一)-中考英语语法单项选择题专项突破(原卷版).doc
- 语法专题三 介词【考点精讲精练】-2023年中考语法一点通(教师版)(1).docx
- 专题25 定语从句-备战2023年中考英语核心语法逐个突破(通用版)(原卷版).docx
- 专题3+动词的时态+2023年中考英语语法题型总复习宝典(1).docx
文档评论(0)