- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
库存理在新形势下烟用物资物流管理工作中的实践和思考
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 广州泥排放管理处.doc
- 广州育英托管学校投资方案.doc
- 广州德食品厂工业废水处理工程案例.doc
- 广州设工程交易中心交易系统表单填写标准.doc
- 广州至上半房地产市场情况及特点.doc
- 广州达宇实业有限公司内部会计管理与控制制度.doc
- 广州物业服务企业安全生产标准化管理规范正式稿.doc
- 广州学模拟电路期末复习题第三五章答案.doc
- 广州道信息科技有限公司简介.doc
- 广州铁项目部度职工培训计划.doc
- 2024年中国钽材市场调查研究报告.docx
- 2024年中国不锈钢清洗车市场调查研究报告.docx
- 2024年中国分类垃圾箱市场调查研究报告.docx
- 2024年中国水气电磁阀市场调查研究报告.docx
- 2024年中国绿藻片市场调查研究报告.docx
- 2010-2023历年初中毕业升学考试(青海西宁卷)数学(带解析).docx
- 2010-2023历年福建厦门高一下学期质量检测地理卷.docx
- 2010-2023历年初中数学单元提优测试卷公式法(带解析).docx
- 2010-2023历年初中毕业升学考试(山东德州卷)化学(带解析).docx
- 2010-2023历年初中毕业升学考试(四川省泸州卷)化学(带解析).docx
最近下载
- 2023年09月九年级数学上册-一元二次方程(有难度)专题培优训练53题【含答案】.pdf
- 小学语文_《棉花姑娘》教学设计学情分析教材分析课后反思.doc
- ctgd sop 38水泵安装作业指导书.pdf VIP
- 什么是人力资源三支柱体系.doc VIP
- YD_T 4042.4-2022 智慧化工园区大数据平台 第4部分:平台运维管理技术要求.docx
- 输电线路施工方案及技术措施.pdf VIP
- 高压架空线路安全施工方案.doc VIP
- 第二章 一元二次方程单元测试2024-2025学年北师大版数学 九年级上册 .docx
- 330kV升压站设备试验施工作业指导书.docx
- 【方案】风电场330kv升压站调试方案.docx
文档评论(0)