- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建设目管理考试资料
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 建筑工企业技术管理制度.doc
- 建筑图与识图实训小作业.doc
- 建筑工与管理论文:议现行建筑工程施工质量验收标准的几个问题.doc
- 建筑圾处理技术规范征求意见稿.doc
- 建筑工专职安全员.doc
- 建筑工图设计深度要求.doc
- 建筑工企业管理人员继续教育讲义..doc
- 建筑工企业的高效团队建设与领导力提升培训大纲.doc
- 建筑工安全信息汇总.doc
- 建筑工体系内部审核检查表监理单位全套.doc
- 期末全真测试卷(教科版)六年级科学下册.docx
- Unit3Healthyorunhealthy?(课件)沪教牛津版(深圳用)英语六年级上册.pptx
- 农业现代化与农村地理(1).pptx
- 农业工程与农业机械技术教学总结.pptx
- Module9Unit3Languageinuse课件英语八年级下册.pptx
- 安徽省黄山市八年级下学期期末考试英语试题(原卷版).docx
- xx关于劳动节的演讲稿字篇范文.pptx
- Module4写作能力提升练英语八年级下册(1).pptx
- Unit1NatureinthebalanceIntegratedskills课件高中英语译林版.pptx
- Unit2WildlifeProtection单词记忆课件高中英语人教版.pptx
文档评论(0)