- 1、本文档共54页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
惠民程信息管理系统用户操作手册
农产品产地初加工惠民工程「信息管理系统」用户操作手册
农产品产地初加工惠民工程「信息管理系统」用户操作手册
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe. PAGE \* MERGEFORMAT II
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by
您可能关注的文档
- 德信企业管理规定汇集.doc
- 德州现代制造产业与物流联动发展对策研究..doc
- 德梁地产问公司全程策划内容要点.doc
- 德州鼎新材料有限公司项目设备管理方案.doc
- 德育作创新方案.doc
- 德育训心得体会.doc
- 德芙克力的广告策划.doc
- 德国学经验分享致理工大的学弟学妹.doc
- 德信培训公关礼仪培训教材.doc
- 德贝充电宝运营方案.doc
- 专题01 二次函数的图像与性质(教师版含解析)-中考数学压轴满分突破之二次函数篇.docx
- 四川省内江市2022-2023学年八年级下学期期末测评数学试卷(含解析).doc
- 专题08反比例函数综合题-(全国通用)(解析版).doc
- 四川省绵阳市三台县2022-2023学年八年级下学期期中质量监测数学试卷(含解析).doc
- 陕西省西安市长安区2022-2023学年八年级下学期期末考试数学试卷(含解析).doc
- 四川省自贡市2022-2023学年八年级下学期期末考试数学试卷(含解析).doc
- 浙江省温州市苍南县2021-2022学年八年级下册数学期中试卷(含答案).docx
- 浙江省嵊州市2020-2021学年八年级下学期 期中数学测试题(含答案).docx
- 山西省朔州市怀仁市2021-2022学年八年级下学期期中学情调研数学试卷(含解析).doc
- 浙江省六校联考2022-2023学年八年级下学期期中考试数学试卷(含解析).doc
文档评论(0)