- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
我国目管理发展现状与国际惯例接轨问题
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 12
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 惠阳长景岭公园一期工程施工组织.doc
- 慢性自我管理小组实施方案.doc
- 慢性预防与控制系列知识讲座j教材.doc
- 惠普司英文介绍.doc
- 悬浇应力箱梁施工方案.doc
- 慈溪家婆软件,分销ERP企业解决方案.doc
- 成为际金融中心的条件.doc
- 成《房地产设计阶段成本控制与景观创新》+龙湖项目实地考察.doc
- 慧茂资生产制造类.doc
- 成功售利器陌生拜访的八个步骤.doc
- 2024-2030年中国医用棉行业发展分析及发展趋势预测报告.docx
- 2024-2030年中国医用扣件行业市场发展趋势与前景展望战略分析报告.docx
- 2024-2030年中国医用智能纺织品行业市场发展趋势与前景展望战略分析报告.docx
- 2024-2030年中国即热式电热水器行业发展分析及发展趋势与投资战略研究报告.docx
- 2024-2030年中国即时通讯行业发展分析及发展前景与投资研究报告.docx
- 2024-2030年中国危险区域LED照明行业市场发展趋势与前景展望战略分析报告.docx
- 2024-2030年中国卫生巾市场销售态势与营销趋势预测报告.docx
- 2024-2030年中国印刷包装设备行业深度调研及投资前景预测研究报告.docx
- 2024-2030年中国卫星应用行业十四五发展分析及投资前景与战略规划研究报告.docx
- 2024-2030年中国卫星遥感行业发展分析及投资风险预警与发展策略研究报告.docx
文档评论(0)