- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
教学作手册新五下数学
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 接地料技术规范书.doc
- 接触化NLC紫外消毒工艺处理生活污水研究.doc
- 接触工程上部施工安全交底书.doc
- 接工作管理规定.doc
- 控制程基础江苏自考大纲.doc
- 振动号数据采集与处理系统的研制.doc
- 控制程第章复习题.doc
- 控制管理的基本职能之一.doc
- 控制程各章小结及答案.doc
- 控制统技术概论到页原文及翻译.docx
- 第12课 大一统王朝的巩固 课件(20张ppt).pptx
- 第17课 君主立宪制的英国 课件.pptx
- 第6课 戊戌变法 课件(22张ppt).pptx
- 第三章 物态变化 第2节_熔化和凝固_课件 (共46张ppt) 人教版(2024) 八年级上册.pptx
- 第三章 物态变化 第5节_跨学科实践:探索厨房中的物态变化问题_课件 (共28张ppt) 人教版(2024) 八年级上册.pptx
- 2025年山东省中考英语一轮复习外研版九年级上册.教材核心考点精讲精练(61页,含答案).docx
- 2025年山东省中考英语一轮复习(鲁教版)教材核心讲练六年级上册(24页,含答案).docx
- 第12课近代战争与西方文化的扩张 课件(共48张ppt)1.pptx
- 第11课 西汉建立和“文景之治” 课件(共17张ppt)1.pptx
- 唱歌 跳绳课件(共15张ppt内嵌音频)人音版(简谱)(2024)音乐一年级上册第三单元 快乐的一天1.pptx
文档评论(0)