- 1、本文档共31页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
数据构教案第六章
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 推动工艺规程设计.doc
- 推导IP资讯化策略对智慧资本积蓄之影响.doc
- 推广目管理.doc
- 推进业现代化讲稿袁制.doc
- 推进职学校办学模式创新.doc
- 推进代造船管理模式.doc
- 掺烧煤安全技术措施.doc
- 提升业竞争力.doc
- 推如何阅读和分析企业财务会计报表.doc
- 提升业团队管理培训课程.doc
- 2024-2025学年高中数学选修1苏教版教学设计合集.docx
- 2024-2025学年高中数学必修 第二册人教A版(2019)教学设计合集.docx
- 2024-2025学年高中化学必修二苏教版教学设计合集.docx
- 2024-2025学年初中物理九年级全北京课改版(2024)教学设计合集.docx
- 2024-2025学年初中信息技术(信息科技)八年级 第12册滇人版(旧版)教学设计合集.docx
- 2024-2025学年高中化学选修4 化学反应原理苏教版教学设计合集.docx
- 2024-2025学年初中信息技术(信息科技)七年级下册黔教版教学设计合集.docx
- 2024-2025学年初中劳动八年级(全一册)广州版教学设计合集.docx
- 2024-2025学年高中历史必修 中外历史纲要(上)统编版(部编版)教学设计合集.docx
- 2024-2025学年小学信息技术(信息科技)五年级上册浙教版(2023)教学设计合集.docx
文档评论(0)