- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
无支沟槽土方开挖工程专项施工方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 12
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 施工目信息管理.doc
- 施工场安全生产保证体系管理资料.doc
- 施工案及措施.doc
- 施工目管理程序.doc
- 施工目安全责任体系.doc
- 施工目管理关键因素分析研究.doc
- 施工目经营管理.doc
- 施工算跟我学.doc
- 施工织架构图.doc
- 施工管理全真模拟评测.doc
- 分析let s单元56ago2卷纸zheng unit56.pdf
- 塑胶材料其它分类原料pa9t 12.pdf
- md16x16数字媒体切换器设备.pdf
- 者参考项目发起人学科类型单位序列承包商修订页代码顺序典型.pdf
- 届世界天然气大会阿姆斯特丹2006add10288.pdf
- 期测试记录表每周weekly g1g6 journeys tests level 6 lesson26.pdf
- modernize-whitepaper现代化您应用程序白皮书.pdf
- anybackup产品典型案例分析.pdf
- 约克金融工程课程tfeslide32.pdf
- 广州市妇女儿童医疗中心历份教学药历01tjy.pdf
最近下载
- 【精准解析】辽宁省大连市2020-2021学年高一下学期期末考试物理试题(历史方向)含解析.doc VIP
- 2022-2023学年深圳市宝安区七年级下英语期末考试题(含答案).docx
- 基于学习进阶的初高中地理教学衔接研究——以“地球自转”为例.pdf
- 2024贵州省专业技术人员继续教育公需科目(满分答案).pdf VIP
- 《传承红色基因推进铸魂育人策略研究》课题申请书.doc VIP
- 爱康医疗(1789.HK)聚焦研发%2b积极出海,开启后集采时代新征程.pptx
- 【暑假专项训练-非连续性文本阅读】部编版小学语文四升五衔接训练题(含答案).doc VIP
- 四种梅毒检测方法的效果对比,性医学论文.docx VIP
- 山西农业大学教师招聘考试题库真题2023.docx
- 公安机关办理刑事案件程序规定试题.pdf VIP
文档评论(0)