- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
无私献深圳长城论开发科技股份有限公司成立于,是全球领先电子产
携手长城开发 共筑卓越未来
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series
您可能关注的文档
- 施工目信息管理.doc
- 施工场安全生产保证体系管理资料.doc
- 施工案及措施.doc
- 施工目管理程序.doc
- 施工目安全责任体系.doc
- 施工目管理关键因素分析研究.doc
- 施工目经营管理.doc
- 施工算跟我学.doc
- 施工织架构图.doc
- 施工管理全真模拟评测.doc
- 2024广西河池市园林处公开招聘1人【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
- 2024江西铜业集团限公司春季校园招聘【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
- 2024广西南宁市狮山公园招聘编制外人员历年【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
- 2024广西柳州市人力资源和社会保障信息管理中心事业单位招聘3人【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
- 2024广西南宁市创良建设投资限责任公司公开招聘14人【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
- 2024广西政协北海市铁山港区委员会办公室公开招聘编外工作人员1人【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
- 2024年黑龙江绥化绥棱县事业单位信息(105人)【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
- 2024广东广州黄埔区红山街道环卫监督管理站招聘15人历年【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
- 2024广东珠海某行政事业单位招聘工程管理人员6人历年【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
- 2024广东能源集团春季线上校园招聘【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
文档评论(0)