- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
时间度控制仪
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 旅游济学习题.doc
- 旅游源开发与规划课程实践指导书.doc
- 旅游最新毕业论文模板旅游管理专业适用.doc
- 旅游场营销题库。简答.doc
- 旅游场营销案例.doc
- 旅游济学讲义.doc
- 旅游济发展论文旅游业发展论文:浅析权力关系对社区参与旅游发展产生影响.doc
- 旅游理专业《旅游英语》四教学大纲.doc
- 旅游理与服务月考试题.doc
- 旅游理专业之我见.doc
- 个人向公司借款合同简洁版(八篇).doc
- [丽水]浙江丽水市莲都区联城幼儿园教育集团招聘 笔试历年典型考题及考点剖析附答案详解.doc
- [周口]2024年河南周口市西华县招聘高中和幼儿教师30人 笔试历年典型考题及考点剖析附答案详解.doc
- [徐州]2024年江苏徐州市贾汪区普通高中贾汪中专选调教师 笔试历年典型考题及考点剖析附答案详解.doc
- 设计委托合同书模板(4篇).doc
- [昆明]2024年云南昆明嵩明县第二人民医院编制外专业技术人员招聘6人 笔试历年典型考题及考点剖析附答案详解.doc
- [昭通]云南昭通市昭阳区事业单位招聘优秀紧缺高层次专业技术人才36人 笔试历年典型考题及考点剖析附答案详解.doc
- [温州]浙江温州市中心医院选聘 笔试历年典型考题及考点剖析附答案详解.doc
- [吉林]2024年吉林师范大学招聘辅导员 笔试历年典型考题及考点剖析附答案详解.doc
- 企业安全生产工作计划标准范文(6篇).doc
文档评论(0)