- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
暨南学考博旅游管理
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 昆明术管理技术规定最新汇总稿...doc
- 时代华企业规范化管理.doc
- 明星物广场员工手册.doc
- 明渠线施工方案.doc
- 昆明山区装修公司大全.doc
- 易哈会计从业资格《财经法规》考点归纳解析.docx
- 易哈江西下半会计证考试《会计基础》精选试题一.doc
- 易哈北京下半会计证考试会计基础全真模拟题十.doc
- 明珠集团系统变革与创新项目.doc
- 昆明修公司一览表.doc
- 美妆个性化定制服务模式下的产品差异化策略与市场竞争力分析报告.docx
- 金融行业客户关系管理数字化升级:跨界融合与产业链重构报告.docx
- 肠道菌群脑-肠轴通路-洞察及研究.docx
- 2025年工业互联网平台数据加密算法效能提升与产业应用创新研究报告.docx
- 神奇的大自然800字11篇范文.docx
- 2025年在线语言培训平台教师激励机制与教师职业发展规划研究报告.docx
- 个人养老金制度实施对绿色金融投资领域的影响与机遇分析报告.docx
- 2025年在线语言培训平台教师激励机制与课程内容设计优化.docx
- 2025年特色农产品品牌培育与市场拓展策略研究报告.docx
- 2025年在线语言培训平台教师激励机制优化与行业可持续发展.docx
文档评论(0)