- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
最全新整理医务人员行为规范与医务礼仪答案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 春高一历史人民版必修专题第课经济全球化的世界练习.doc
- 春会计基础讲义考试考点.好.doc
- 昭林具销售计划.doc
- 晋中典文化传媒有限公司公司章程.doc
- 晋中技创新园总体规划稿.doc
- 晋城业集团工会工作总结.doc
- 晋升科级领导职务任前必修课考试提纲.doc
- 易模MAYA场景类动画用模型制作规范与流程标准高低精度.docx
- 晓桐东莞电信客户关系管理研究改完..doc
- 晋煤团绩效考核与薪酬管理办法.doc
- 龙岩市上杭县东北片区2022-2023学年七年级下学期期中历史试题.docx
- 龙岩市上杭县2022-2023学年七年级上学期期末语文试题.docx
- 龙岩市上杭县2022-2023学年七年级上学期期末生物试题【带答案】.docx
- 龙岩市上杭县2022-2023学年七年级上学期期末生物试题.docx
- 龙岩市上杭三中、四中、实验中学2022-2023学年七年级下学期期中数学试卷.docx
- 龙岩市2022-2023学年七年级上学期期末生物试题【带答案】.docx
- 龙岩市2022-2023学年七年级上学期期末生物试题.docx
- 齐齐哈尔铁锋区第五十二中学2022-2023学年七年级下学期月考数学试题.docx
- 齐齐哈尔市龙沙区2022-2023学年七年级上学期期末语文试题【带答案】.docx
- 齐齐哈尔市龙沙区2022-2023学年七年级上学期期末语文试题.docx
文档评论(0)