- 1、本文档共48页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
最新草累强制性国家、行业标准清单
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 景区理重点整理.docx
- 时间段控制阀.doc
- 景观计费家装工装设计费标准收费.doc
- 普通中课程标准实验教科书历史必修Ⅱ《经济成长历程》岳麓版.doc
- 智能制的原理及应用.doc
- 智慧:如何让绩效管理体系在中小企业顺利运行.doc
- 智能别墅设计方案含安防监控综合布线卫星电视物业管理系统.doc
- 智慧市应用:应急综合管理信息系统.doc
- 智慧市行业现状以及市场发展前景分析.doc
- 智能制题目及解答.doc
- 海南省2024-2025学年高一下学期学业水平诊断(二)语文.pdf
- 河南省2024-2025高一年级下学期期末教学质量监测政治.docx
- 山东省莱州市第一中学2024-2025学年高二下学期期末全真训练测试 化学 PDF版含答案.pdf
- 安徽省江淮协作区2024-2025学年高一下学期期末考试英语试卷(含答案).docx
- 海南省2024-2025学年高一下学期学业水平诊断(二)化学.pdf
- 安徽省江淮协作区2024-2025学年高一下学期期末考试生物试卷(含答案).pdf
- 海南省2024-2025学年高一下学期学业水平诊断(二)物理.docx
- 安徽省江淮协作区2024-2025学年高一下学期期末考试化学试卷(含答案).docx
- 2026年高考英语(外研版)提能训练(二).pdf
- 2026年高考英语(外研版)提能训练(一).pdf
文档评论(0)