- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
朗松业家具生产订单ERP管理软件介绍新版门厂专业管理系统
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 最新营企业劳动合同样本免费.doc
- 最新资分析形成性考核作业及答案.doc
- 最新车覆盖件冲压成形模具设计制造与组合装配工艺技术手册.docx
- 最新钢企业员工绩效标准化考核评价与创新管理制度及表格范本.docx
- 最新营企业工资方案.doc
- 最新高鸿业《西方经济学》无敌笔记汇总.doc
- 最高关于贯彻执行刑诉规则.doc
- 最有前景的创业好项目.doc
- 最新计继续教育试题及答案.docx
- 月亮第十二组标施工组织设计.doc
- 新改版北京中图版七年级上册地理全册精编知识点.pdf
- 2025年天津市城镇道路应急救援通道优化设计可行性研究报告.docx
- 1.1+青春的邀约+课件- 统编版道德与法治七年级下册.pptx
- 2025年上海市垂直养殖针对连锁餐饮中央厨房的可行性研究报告.docx
- 1.1+奏响中学序曲 统编版道德与法治七年级上册.pptx
- 2025年上海市帆船主题海洋科普教育基地建设可行性研究报告.docx
- 2025年上海市高海拔区域温室反季节水果种植可行性研究报告.docx
- 2025年新(北京)中图版七年级上册地理全册精编知识点(用心编辑).pdf
- 2025年天津市会展经济带动区域产业联动可行性研究报告.docx
- 2025年上海市灌溉水渠水土保持综合治理可行性研究报告.docx
文档评论(0)