- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
机械业出版社新编教材交稿要求
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE - 6 -
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts m
您可能关注的文档
- 最高关于贯彻执行刑诉规则.doc
- 最有前景的创业好项目.doc
- 最新计继续教育试题及答案.docx
- 月亮第十二组标施工组织设计.doc
- 最终化工原理课程设计水吸收氨填料吸收塔设计.doc
- 最牛职信让你看到最牛的职业.doc
- 最新企业所得税度A类网上申报操作流程.doc
- 最详的金融和金融工程申请攻略.docx
- 月亮汽车城广告策划书.doc
- 最新职业危害告知牌标准版..doc
- 2025年中国排水渠井盖数据监测报告.docx
- 1127高一【数学(人教A版)】正弦函数、余弦函数的图象-课件.pdf
- 2025年5月汉中市铁路中心医院招聘工作人员的(1人)模拟试卷(含答案详解).docx
- 2025年中国烤漆扇数据监测报告.docx
- 建筑施工企业应急救援培训计划.docx
- 2025年5月汉中市铁路中心医院招聘工作人员的(1人)模拟试卷附答案详解(黄金题型).docx
- 2025年5月汉中市铁路中心医院招聘工作人员的(1人)模拟试卷附答案详解(综合题).docx
- 2025年山东聊城市市属事业单位初级综合类岗位招聘68人笔试模拟试题及参考答案详解1套.docx
- 健康教育推广中心2025年工作总结及2025年工作计划.docx
- 2025年5月汉中市铁路中心医院招聘工作人员的(1人)模拟试卷附答案详解(实用).docx
文档评论(0)