- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
最牛职信让你看到最牛的职业
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 智能电新拐点:传统家电企业的战略救赎.doc
- 智能建筑工程的成本控制及竣工审核.doc
- 智能建筑系统工程施工及规范.doc
- 曲师管理学院试卷.doc
- 暨南学考博旅游管理.doc
- 暑期职话务员.doc
- 智达递公司策划书初稿初审.doc
- 曲靖林业工作总结及工作打算.doc
- 更换压支架立柱的安全技术措施最终版.doc
- 曹县库竣工验收鉴定书.doc
- 2026届高考数学总复习(第1轮)基础版第50讲 直线的方程.pptx
- 《关于组织开展能源领域氢能试点工作的通知》解读及对策.docx
- 二年级数学奇妙的动物世界跨学科项目化学习设计.docx
- 高一美术传承与创新中国近现代美术思政融合课教学设计.docx
- 2025年湖北省省直辖行政单位选调生考试(行政职业能力测验)综合能力测试题带答案.docx
- 2025年温州医科大学仁济学院单招语文测试模拟题库附答案.docx
- 2025年清远职业技术学院单招(语文)测试模拟题库附答案.docx
- 2025年湖北省咸宁市事业单位招聘考试(职业能力倾向测验)题库及答案1套.docx
- 2025年温州大学单招语文测试题库有答案.docx
- 2025年湖北省荆州市单招语文测试模拟题库a4版.docx
文档评论(0)