- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
服装生产流程图
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 月度效考评管理制度.doc
- 有关业风险管理论文关于企业管理论文:浅谈企业风险管理.doc
- 有关产销售的技巧.doc
- 月煤炭市场运行情况分析及后市预测.doc
- 有关个工程中小企业信息管理问题的研究.doc
- 月经济活动分析材料经营计划部.docx
- 有关地承包制的几个产权概念.doc
- 有关央经济工作会议的分析评论.doc
- 有关品生产成本计算的习题.doc
- 有关币通货膨胀论文关于货币的论文:货币政策与通货膨胀的抑制.doc
- 适用于新高考新教材新疆专版2025届高考地理一轮总复习考点规范练11常见天气系统.doc
- 适用于新高考新教材广西专版2025届高考语文一轮总复习特殊任务实用类文本阅读与整本书阅读.doc
- 适用于新高考新教材浙江专版2025届高考生物一轮总复习第2单元细胞的代谢作业8酶的本质和功能浙科版.doc
- 适用于新高考新教材浙江专版2025届高考生物一轮总复习单元检测10实验专题浙科版.doc
- 适用于新高考新教材浙江专版2025届高考化学一轮总复习第5章物质结构与性质元素周期律作业15原子结构.doc
- 适用于新高考新教材新疆专版2025届高考地理一轮总复习考点规范练5地球的历史和地球的圈层结构.doc
- 适用于新高考新教材新疆专版2025届高考地理一轮总复习考点规范练14洋流与海_气相互作用.doc
- 遗嘱公证细则全文.pptx
- 遗嘱公证细则失效.pptx
- 常见CT检测设备运行维护管理.pdf
文档评论(0)