- 1、本文档共50页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
某中教学楼施工组织设计
兰州交通大学博文学院毕业设计(论文)
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 50
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel pa
您可能关注的文档
- 机械计部绩效考核制度.doc
- 机械造与自动化专业毕业论文.doc
- 机械造企业安全生产管理标准化模板.doc
- 机械计课程设计说明书带式输送机传送装置西北工业大学.doc
- 机械造工程大纲.doc
- 机械造及自动化学科专业硕士攻读博士学位研究生培养方案.doc
- 机械程学院本科教学工作情况汇报。。.doc
- 机械造工程学.docx
- 机械造企业ERP经验.doc
- 机械造基础综合练习题答案仅供参考.doc
- 《概率论》第1章 概率论的基本概念-教学课件(非AI生成).ppt
- 《概率论》第4章 随机变量的数字特征-教学课件(非AI生成) (2).ppt
- 2023年忠县公务员考试行测真题及答案详解(历年真题).docx
- 2023年呼伦贝尔市公务员考试行测真题附答案详解(名师推荐).docx
- 2023年塔城地区公务员考试行测真题及答案详解1套.docx
- 2023年宜昌市公务员考试行测真题附答案详解(黄金题型).docx
- 2023年奉节县公务员考试行测真题附答案详解(黄金题型).docx
- 2023年广州市公务员考试行测真题附答案详解.docx
- 2023年大庆市公务员考试行测真题及一套完整答案详解.docx
- 2023年益阳市公务员考试行测真题完整答案详解.docx
文档评论(0)