- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
武汉学东湖分校大学手工艺协会章程
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 校园品店创业计划书.doc
- 桁架产用到的所有知识总结.doc
- 桂林市子珑润城物业管理方案.doc
- 格尔炼油厂管理提升活动实施方案.doc
- 标准供电所工作流程.doc
- 桂林子科技大学信息科技学院财务报表分析试题.doc
- 根据合体轴测图绘制三视图.doc
- 框架构单位工程组织设计毕业论文.doc
- 框架构施工组织设计.doc
- 案例判规则解析.doc
- 8冀中的地道战省公开课一等奖新名师优质课比赛一等奖课件.pptx
- IECQ-QC-080000:-第四版统一标准.doc
- BTG大联锁专项措施专业资料.doc
- LOL电子竞技比赛专业策划书.doc
- 公⽂写作 · 作业练习3.pdf
- 商贸零售行业4月投资策略暨一季度业绩前瞻:行业延续复苏平稳,关注细分龙头一季报表现.docx
- 商贸零售行业财报总结暨5月投资策略:行业平稳龙头增速领先,降本增效驱动盈利优化.docx
- 商贸零售行业2023年年报及2024年一季报业绩综述:美妆国货龙头加速崛起,跨境电商黄金珠宝医美龙头增速稳健.docx
- 商贸零售行业2023年年度业绩综述报告:零售23年营收同比下行,互联网电商业绩改善.docx
- 商贸零售行业2024Q1业绩综述报告:一季度零售业绩回落,电商迎开门红.docx
文档评论(0)