- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业计金融彭伟
山东商业职业技术学院会计学院毕业设计专用纸
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts m
您可能关注的文档
最近下载
- 2024年湖南省高中学业水平合格性考试数学试卷真题(含答案详解).pdf VIP
- 10.农庄小能手(搭架)(教学设计)-三年级下册劳动教育”小农庄“(校本课程).docx VIP
- 农庄小能手(积肥)(教学设计)-四年级下册劳动教育“小农庄”(校本课程).docx VIP
- 2018年人教版一年级下册《道德与法治》全册教案及其教学计划.doc VIP
- 三人合作经营合同协议书.docx VIP
- 世界上最棒的礼物幼儿园儿童故事绘本PPT课件.pptx VIP
- 世界上最棒的礼物幼儿园儿童故事绘本PPT课件.pptx VIP
- 幼儿园故事《世界上最棒的礼物》绘本故事PPT课件.pptx VIP
- 幼儿园故事《世界上最棒的礼物》绘本故事PPT课件.pptx VIP
- 中国石化品牌管理手册解读(适用业务简单的单位).pptx
文档评论(0)