- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
洁净房工艺管线管理制度
程序性文件洁净厂房工艺管线管理制度文本编号SOP-A1-005版本号01生效日期2008-06-30第 PAGE 7 页 共 NUMPAGES 7 页
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test an
您可能关注的文档
最近下载
- 感悟生命_我的生命之树_教案 心理健康八年级全一册.docx VIP
- 企业架构(4A架构)一体化设计方法.docx VIP
- 文秘英语实训(第二版)教参..doc
- 2023-2024学年山东省青岛二中高一(上)期中数学试卷【答案版】.pdf VIP
- 四川省绵阳市涪城区2025届九年级下学期中考三模数学试卷(含答案).docx VIP
- 文学常识题库(含答案).docx VIP
- 主检医师规范化及能力提升培训考试试题.docx
- T_CMSA 0021—2021_民用无人机作业气象条件等级植保.pdf VIP
- 2023年广西玉林市玉州区小升初数学试卷附答案解析.docx VIP
- T/CCIAT 0015-2020 建筑劳务管理标准.pdf VIP
文档评论(0)