- 1、本文档共86页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
海河工组织设计
新海公寓20#楼大厦 施工组织设计
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 86
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the t
您可能关注的文档
- 浅谈算机在我国会计工作中的应用与发展.doc
- 浅谈计电算化现状与发展趋势.doc
- 浅谈镇企业管理.doc
- 浅谈算机控制过程中的新方法、新手段、新器件、新理论的应用.doc
- 浅谈过程工程造价的管理与控制.doc
- 浅谈设工程造价管理改烦烦烦.doc
- 浅谈路项目清概管理.doc
- 浅谈工组织设计方案研究(1.doc
- 浆砌护坡施工方案最后的.doc
- 测绘全生产管理修.doc
- 金太阳山西省2024-2025学年高一下学期期末考试地理含答案.pdf
- 城区供水分区供水管线完善实施方案.docx
- 城区供水分区供水管线完善可行性研究报告.docx
- 五年级科学秋季开学第一课(人教鄂教版).pptx
- 解读《GB_T 44445-2024智能移动终端未成年人保护通用规范》全面解读.docx
- 城市供水功能保障提升实施方案.docx
- 双减背景下巧做加减法助力课堂提质增效.docx
- 寒假安排家长会课件.pptx
- 金太阳山西省2024-2025学年高二下学期期末考试含答案(9科试卷).pdf
- 解读《GB_T 44435 - 2024信息与文献 数字文件(档案)转换和迁移过程》全面解读.docx
文档评论(0)