- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
现浇梁施工方案范本
东盟公司镇溧高速公路ZL—ZJ3合同段C匝道现浇箱梁施工方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 38
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color al
您可能关注的文档
最近下载
- 预防滑倒、绊倒、跌倒.ppt VIP
- 七年级历史上册 第一单元第1课 中国境内早期人类的代表—北京人课件 新人教版.ppt VIP
- 津津有味读经典LEVEL3《海底两万里》正文与评价手册答案.pdf VIP
- 2.1主权统一与政权分层 课件(共27张PPT)高中政治统编版选择性必修一当代国际政治与经济.pptx VIP
- 最新人教版五年级数学上册 全册PPT课件全集(438张).pptx VIP
- 档案整理及数字化服务项目实施方案46页.doc VIP
- 2025年海南省中考语文试题卷(含答案解析).docx
- GB24315-2009 校车标示国家标准.pdf VIP
- 《慢阻肺》ppt课件_原创精品文档.pptx VIP
- 安徽省2025年高考:《政治》考试真题与参考答案.pdf
文档评论(0)