- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第七梁分析和横截面形状
ANSYS高级分析技术指南 梁分析和横截面形状
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by serie
您可能关注的文档
- 第一度营销计划.doc
- 站场棚工程施工监理细则.doc
- 第一商业银行导论.doc
- 第一建筑工程计量与计价概述.doc
- 第一市场营销学理论概要.doc
- 第一建设工程定额概论.doc
- 第一战略与战略管理文档.doc
- 第一怎样看模型的工作图纸.doc
- 第一战略性人力资源管理概论.doc
- 第一执行总结.doc
- 贵州贵州省建设投资集团有限公司招聘考试真题附答案详解(研优卷).docx
- 河南南阳师范学院2021年招聘25名硕士研究生冲刺卷一(附答案与详解)及答案详解(名校卷).docx
- 陕西延长石油 (集团) 有限责任公司 所属单位招聘笔试题库及答案详解(必刷).docx
- 贵州民航产业集团有限公司招聘笔试题库含答案详解(基础题).docx
- 广汉市2025年公开招聘社区专职工作者(125人)考试备考题库含答案详解(考试直接用).docx
- 邢台市水务发展集团有限公司招聘真题附答案详解(实用).docx
- 新华保险总部人力资源部(党委组织部)招聘笔试题库含答案详解(预热题).docx
- 贵州苔茶产业发展集团有限公司招聘笔试题库含答案详解(b卷).docx
- 广汉市2025年公开招聘社区专职工作者(125人)考试备考题库附答案详解(综合题).docx
- 贵州城乡产业发展集团有限公司招聘笔试题库附答案详解(实用).docx
文档评论(0)