- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
航天力研究所工会
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 20
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 自动制系统的数学模型.doc
- 自动制造系统试卷自考资料.doc
- 自动电力系统方向计算机控制课程设计任务书.doc
- 自动水灭火系统施工及验收规范GB.doc
- 自动制原理第一章绪论.doc
- 自动的喷水灭火装置技术规范.doc
- 自动的喷水灭火装置认证技术规范.doc
- 自动制理论课件ch.doc
- 自动水灭火系统设计规范讲义.doc
- 自动立体仓库信息管理与监控系统.doc
- 2025年新疆维吾尔自治区昌吉州奇台县高三下学期数学基础题、中档题型强化训练.docx
- 2025-2030中国陶瓷微珠行业市场现状分析及竞争格局与投资发展研究报告.docx
- 2025-2030中国陶瓷市场调研及发展策略研究报告.docx
- 2025-2030中国陶瓷微致动器行业市场现状供需分析及投资评估规划分析研究报告.docx
- 2025-2030中国陶瓷换能器行业市场现状供需分析及投资评估规划分析研究报告.docx
- 2025-2030中国陶瓷插件行业市场发展趋势与前景展望战略分析研究报告.docx
- 2025-2030中国陶瓷插件行业市场发展趋势与前景展望战略研究报告.docx
- 2025-2030中国陶瓷换能器行业市场发展趋势与前景展望战略研究报告.docx
- 2025年新疆维吾尔自治区昌吉州呼图壁县高三一模数学试卷及答案.docx
- 2025-2030中国陶瓷支撑剂市场销售量预测及投资战略研究研究报告.docx
文档评论(0)