- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西客施工组织设计
客站南广场综合楼工程施工组织设计 北京城建五建设工程有限公司
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 90
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by
您可能关注的文档
最近下载
- 第十四讲新中国与中华民族的新纪元(1949—2012)-中华民族共同体概论专家大讲堂课件.pptx VIP
- 中等职业技术学校《汽车电工电子技术》课程标准.docx VIP
- 2025年一建一级建造师项目管理考点重点知识总结高分笔记.pdf VIP
- 国际文化产业城总体策划及概念规划方案.ppt VIP
- CATIA高级应用 建立标准件库.pdf VIP
- PW6513-2.2数据手册下载.pdf VIP
- 河北省新时代NT教育2024-2025学年高三入学摸底测试 英语试(无答案).docx VIP
- 小儿甲基丙二酸血症护理业务学习.pptx VIP
- 第十三讲先锋队与中华民族独立解放(1919—1949)-中华民族共同体概论专家大讲堂课件.pdf VIP
- (正式版)-B 5768.2-2022 道路交通标志和标线 第2部分:道路交通标志.docx VIP
文档评论(0)