- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
计算操作系统存储管理练习题
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 西安北工业区临潼现代工业组团.doc
- 西安大科教产业有限责任公司.doc
- 西安子科技大学榆林函授站上学期期末考试管理会计试卷.doc
- 西安大春季工商管理本科普通答辩安排表.doc
- 西安城南区普通住宅市场运行情况.doc
- 西安科集团样册科技.doc
- 西安房地产企业目录.doc
- 西安色家园前期规划建议书.doc
- 西安房地产市场分析.doc
- 西安鹏酒店管理公司简介.doc
- 中等教育中的跨文化理解与交流课程设计考核试卷.docx
- 名师测控九上数学试卷.docx
- 2025至2030中国复方碘酊消毒液行业市场深度分析及发展趋势与行业项目调研及市场前景预测评估报告.docx
- 中等教育中跨文化教育的政策与实践考核试卷.docx
- 中等教育中的人文艺术课程整合案例考核试卷.docx
- 景泰蓝工艺Cloisonnecraft43课件.pptx
- 中等教育中的国际理解教育考核试卷.docx
- 2025至2030中国自行车挡泥板行业运营态势与投资前景调查研究报告.docx
- 2025至2030中国高档装饰单板行业市场深度研究与战略咨询分析报告.docx
- 2025至2030鱿鱼干行业产业运行态势及投资规划深度研究报告.docx
文档评论(0)