- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
试论计造假及防范措施
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 论企资金的筹措及其应用和管理.doc
- 论企管理的若干问题.doc
- 论企绿色物流管理.doc
- 许纯《西方经济学》第版笔记第章需求、供给和价格.doc
- 论传财务管理与柔性财务管理的对比研究.doc
- 论企生存发展之道.doc
- 论企筹资效益与风险.doc
- 论全风险管理ERM框架体系的构建.doc
- 论企负债经营与财务风险的控制.doc
- 论会职业道德的重要性.doc
- 2025江西赣州城投工程管理有限公司招聘23人笔试历年参考题库附带答案详解(10卷合集).docx
- 小学六一儿童节中队活动方案.pptx
- 2025浙江平阳县交通投资集团矿业有限公司招聘劳务派遣人员4人笔试历年参考题库附带答案详解(10卷合集).docx
- 2025年泰妍性格测试题及答案.doc
- 2025年泰坦测试题目及答案.doc
- 2025福建福州榕发置业有限公司招聘4人笔试历年参考题库附带答案详解(10卷合集).docx
- 校园五四青年节活动策划方案.pptx
- 2025福建省冶金(控股)有限责任公司招聘财务结算中心一般管理人员人员笔试历年参考题库附带答案详解(10卷合集).docx
- 常用的教师节的活动方案策划.pptx
- 小学生书法培训方案.pptx
文档评论(0)