- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
超市度工作总结
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 质量服务规范草稿.doc
- 质量收评定标准讲解.doc
- 质量测技能训练大纲.doc
- 质量合考核细则.doc
- 质量济性管理的基本原则c.doc
- 质量摘试谈质量人的特性.doc
- 货物易进口付汇操作指引企业版外汇管理局.doc
- 质量安全、环境管理体系三体系.doc
- 质量理人员考核、培训大纲.doc
- 质量定通用表格.doc
- DB44_T 2611-2025 城市排水管网有毒有害气体监测与风险分级管理技术标准.pdf
- DB44_T 2612-2025 竞赛类科普活动策划与实施服务规范.pdf
- DB43_T 2947-2024 烟草种子质量控制规程.pdf
- DB37_T 4836-2025 煤矿风量实时监测技术要求.pdf
- 叉车防撞系统,全球前22强生产商排名及市场份额(by QYResearch).docx
- 超滤膜,全球前18强生产商排名及市场份额(by QYResearch).docx
- DB62T 4172-2020 玉米品种 酒623规范.pdf
- DB62T 4160-2020 在用真空绝热深冷压力容器综合性能在线检测方法.pdf
- DB62T 4164-2020 辣椒品种 酒椒1号.pdf
- DB62T 4133-2020 公路隧道地质超前预报机械能无损探测技术规程.pdf
文档评论(0)